- Manual testing of all G.168 cases
- Echo Path Loss (EPL) and Echo Path Delay (EPD) fully controllable in T1/E1 card
- Use RTP ToolBox™ (PKB100) and G.168 compliance test suite (PKB105)
- Dual HD T1/E1 card (HDT001 or HDE001) with Delay/Attenuate software
- Uses GLC View to manualy analyze G.168 compliance
- Full automation currently not available, but coming soon
- Manual procedures are very similar to the procedures provided at EC Compliance Testing per G.168 page
Buyer's Guide:
Please Note: The XX in the Item No. refers to the hardware platform, listed at the bottom of the Buyer's Guide,
which the software will be running on. Therefore, XX can either be DPT, DPE, PCT, PCE, HDT, HDE, DLT, DLE or UTE depending
upon the hardware.
Back to Echo Canceller Testing Solutions Main Page